Real results from real clients. See how Utility Wranglers has helped organizations across diverse industries achieve significant energy and cost savings.

A cutting edge 3D printing facility partnered with Utility Wranglers to address rising energy costs, frequent equipment failures, and corporate environmental standards. Through harmonic filtering to augment their solar array, they achieved remarkable results.
High energy consumption from industrial equipment and reactive maintenance approach leading to unexpected downtime and costly repairs.
Implemented harmonic filtering, optimized motor drives, and established predictive maintenance protocols.
The team at Utility Wranglers delivered exactly what they promised. We haven't lost a compressor motor in months, our facility now operates at peak efficiency with our existing solar strategy, and we have reduced our carbon footprint significantly while saving money.
— General Manager
This major distribution center needed to reduce operational costs while maintaining 7 day a week uptime. Utility Wranglers delivered a comprehensive solution that exceeded expectations.
Massive warehouse space requiring constant climate control and lighting, with aging HVAC systems consuming excessive energy and requiring frequent repairs.
Zone-based HVAC optimization, motion-sensor LED lighting throughout warehouse, dock door seals and insulation upgrades, and automated building management system.
The team at Utility Wranglers understood our 24/7 operational requirements and delivered solutions that work. Our facility has never run more efficiently, we aren't losing light ballasts or HVAC, and our opex is way down!
— Facilities Manager
A major pizza brand franchisee with 69 locations sought to reduce energy and equipment maintenance across all properties while maintaining food quality and customer comfort.
High energy consumption from refrigeration, cooking equipment, and HVAC systems. Frustratingly high maintenance on HVAC systems causing discomfort and loss of productivity.
Harmonic filtering for the building.
We don't want Team Members servicing electronics, we want them focused on providing exceptional service to our customers. This product makes that possible.
— General Manager
A County Government that utilizes our Maximum Power Transfer Solution for County offices and the 377,000 square foot County jail.
Aging buildings with inefficient systems, limited budget for upgrades and maintenance, and need to minimize disruption for 24-hour secure facility.
Phased implementation of the Industrial Electrical Filtration system to filter harmonics, arrest transient voltage, eliminate reactive power, and increase power factor to near 100%.
Why should you use this solution? One word "Maintenance." It reduced service and maintenance cost, not to mention the hassle avoided."
— Facilities Director
Join hundreds of organizations that have transformed their energy efficiency with Utility Wranglers.